top of page

SBC 801 (2024) Chapter 1 – Administrative Process Flowcharts

Writer: Balvant Jhaveri
Balvant Jhaveri
7 days ago
1 min read

Fire safety compliance runs from design and approval through construction, inspection and ongoing maintenance.

The flowcharts summarise the key administrative processes in SBC 801 (2024), Chapter 1, covering design review, amendments, permits, fees, inspections, maintenance, appeals and unsafe buildings.

Each step includes the relevant section references, providing a practical guide for designers, consultants, contractors and asset owners.

The aim is to make the process easier to follow: understand what requires approval, recognise inspection hold points, and see how deficiencies and disputed decisions are addressed.

SBC 801 (2024) Chapter 1 administrative process flowchart – slide 1
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 2
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 3
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 4
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 5
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 6
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 7
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 8
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 9
SBC 801 (2024) Chapter 1 administrative process flowchart – slide 10

Comments


© 2025-2026 "Fire and Smoke Systems". Powered and secured by Wix

  • Linkedin
  • Youtube
  • Facebook
  • x-logo
bottom of page